Permit Types

Street Occupancy
  • The purpose of a street occupancy permit is to allow contractors to have access to an area where construction/renovations are being done.
  • This permit would allow them to place a dumpster, staging, and or vehicles for construction purposes.
  • Depending on your needs for space you can reserve multiple parking spaces to fit your needs.
  • Within a Street Occupancy Permit, a crane permit, includes 2 Parking Spaces, an adjacent lane closure for outriggers, and a sidewalk closure to be able to lift loads over.
  • Each parking space is 20 feet in length, if your going to need more space just add more parking spaces.
  • If you maintain an occupancy outside the permit details additional fees and violation charges will apply.
  • For the Parking Division to be able to enforce towing if you have parking spaces reserved you need to pickup and post it as no parking 12 hours in advance of your scheduled occupancy. 
  • This permit type will not allow you to occupy handicap or no parking areas.
Sidewalk Occupancy
  • This Permit Type allows you to occupy the Sidewalk in the Public Right Of Way.
  • This Permit Type allows you to close the public sidewalk from the nearest ADA accessible crossings on either side of your location.
  • You must provide adequate signage to route pedestrians around your closed sidewalk zone.
  • Additional Fees apply if your planning on having a vehicle, lift, dumpster or any other heavy equipment placed on the sidewalk.
  • If you maintain an occupancy outside the permit details additional fees and violation charges will apply.